With this house in Haarlem we have demolished the zinc roofing of the dormer and replaced it with a 2-layer bitumen system. The roof edges have also been raised and neatly finished with a zinc flashing.
Old zinc cladding removed
First, the old zinc was removed from the dormer. Then, we raised the roof edges with new wood. This created a sturdy, higher edge to which the new roofing can connect properly.
Waterproof roof with 2 layers of bitumen
First, a bitumen underlay was applied to the roof and mechanically fastened. The top layer was then torched over this, including along the connection with the tiled roof. Together, these two layers form a strong and watertight structure. flat roof that lasts for years.
Roof edge finished with zinc flashing
Finally, the roof edges are finished with a zinc capping strip. This protects the top of the roof edge against rain and gives the dormer a sleek, neat appearance.
Result
The dormer is watertight again and ready for the coming years. Would you like to have your dormer renovated too? Read more about lead and zinc work and roof renovation, or contact for a no-obligation quote.